Customization: | Available |
---|---|
After-sales Service: | on-Site/ on-Line |
Warranty: | 1 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Paper/PE, PT/PE, PET/AL/PE, BOPP/PE, Tea filter paper and other compound materials can be heat sealed.
Type
|
HWBM-BF-200
|
HWBM-BF-260
|
HWBM-BF-300
|
HWBM-BF-400
|
Process Stations
|
8
|
8
|
8
|
8
|
Pouch Size-Length (mm)
|
120-450
|
120-450
|
120-450
|
200-550
|
Pouch Size-Width (mm)
|
70-200
|
110-260
|
180-300
|
300-400
|
Packing Speed (pouches/min)
|
20-60
|
20-60
|
20-60
|
20-60
|
Power Requirement (V/Hz)
|
380VAC 3P 50HZ
|
380VAC 3P 50HZ
|
380VAC 3P 50HZ
|
380VAC 3P 50HZ
|
Power Supply (KW)
|
3.0
|
3.0
|
4.0
|
4.0
|
Compress Air Required (Mpa)
|
0.6-0.8
|
0.6-0.8
|
0.6-0.8
|
0.6-0.8
|
Compress Air Consumption (m3/min)
|
0.3
|
0.3
|
0.3
|
0.3
|
1. Q: Are you a manufacturer or just a trading company?
A: Foshan Henwi Technology company is one of the top technology-oriented machinery manufacturer in China.
2. Q: I am new in this field , can you recommend the whole production line?
A: We can recommend you the whole production line depends on what products you will make:
(1). If for paste or cream product, the following machine we will recommend you:
RO water treatment equipment → Vacuum homogenizer → Storage tank → Paste filling machine or Heating mixing filling machine → Capping machine → Labeling machine → Inkjet printer → Shrink film packing machine etc.,
(2). If for liquid product, the following machine we will recommend you:
RO water treatment equipment → Blending tank → Storage tank → Liquid filling machine → Capping machine → Labeling machine → Inkjet printer → Shrink film packing machine etc.,
(3). If for Perfume, the following machine we will recommend you:
RO water treatment equipment → Perfume making machine → Perfume storage tank → Perfume filling machine → Perfume crimping machine → Perfume collar machine → Inkjet printer → Shrink film packing machine etc.,
(4). There are Full automatic production line and Semi automatic production line for your option.
3. Q: What is your payment term?
A: We usually pay by T/T., 40% deposit after sales confirmation, 60%before delivery.
4. Q: What is your delivery day?
A: Our delivery day is about 15-30 days after receive the deposit.